Search productSearch post

CO₂ Booster Pump Equipment
CO₂ Booster Pump Equipment
CO₂ Booster Pump Equipment
CO₂ Booster Pump Equipment

CO₂ Booster Pump Equipment

  • Keywords:CO₂ booster pump, carbon dioxide booster, CO₂ compression
  • Category:CO2 Process Equipment

The CO₂ Booster Pump Equipment is a high-performance system designed to adjust and increase the pressure of carbon dioxide gas for various industrial applications. This equipment is ideal for use in CO₂ fracturing pump trucks, carbon capture, utilization, and storage (CCUS), and other industrial processes. It features robust construction, high pressure capabilities, and efficient operation, ensuring reliable performance and minimal maintenance requirements.

CLICK TO INQUIRE

Product Introduction

The CO₂ booster pump equipment is a high-efficiency device specifically designed for CO₂ fracturing operations. It regulates pressure to support the operation of CO₂ fracturing pump trucks. This equipment can flexibly adjust pressure according to actual needs, ensuring stable flow and pressure during the injection and use of carbon dioxide. It is widely applied in oil and gas extraction, geothermal energy development, and other fields.

Product Features

  • Flexible Transport Options: The equipment can be transported using skid-mounted or specialized vehicles for easy movement and deployment on-site.
  • High Working Flow Rate: With a maximum flow rate of up to 8 m³/min, it meets the demands of large-scale fracturing operations.
  • Powerful Drive Options: Available in diesel or electric drive configurations, adapting to different operational environments and energy conditions.
  • Stable Working Pressure: Rated working pressure of 2.5 MPa ensures efficient and stable fracturing operations.
  • Excellent Boosting Capacity: The centrifugal pump has a boosting capacity of ≥0.7 MPa, enhancing the efficiency of CO₂ injection.

Applications

  • Oil and Gas Extraction: Used for CO₂ enhanced oil recovery and fracturing operations to improve extraction efficiency.
  • Geothermal Energy Development: Provides stable CO₂ injection support in geothermal projects, enhancing energy recovery.
  • Mineral Resource Development: Suitable for CO₂ injection and resource recovery in mining, improving the economic viability of mineral extraction.
  • Environmental Projects: Contributes to carbon capture and utilization (CCUS) initiatives, supporting emission reduction and resource recovery for sustainable development.
Parameter Description
Transport Mode Skid-mounted or special vehicle
Maximum Operating Flow 8 m³/min
Power Diesel or electric driven
Rated Working Pressure 2.5 MPa
Centrifugal Pump Boosting Capacity ≥0.7 MPa
Expand more!
CO₂ Booster Pump EquipmentCO₂ Booster Pump Equipment

Click on the inquiry